Gurugram
+919990645119

POWER BANK Design & Development of Complete AT...

POWER BANK Design & Development of Complete ATE Setup. • We are Design and Develop the Complete ATE Setup As per Customer Requirements A. Automatic Functional Tester We are developing customized automatic test setup of PCBA and box type product using by LabVIEW/ LabWindows CVI, Software. We are developing automatic testing with IC programming. Control the All Instruments through Programming using Communication protocol (RS485, RS232, USB, Ethernet, TCP/IP, UDP..Etc..) B. Automatic ICT Tester (MDA): Automatic ICT Tester (MDA): We are developing customized automatic ICT test setup using by LabVIEW/ Labwindows CVI software. In which we measure all Semiconductor device (Resistance, Capacitor, Diode, Open and Short test of components) of PCBA. C. ICT cum Functional Tester: As per customer requirement, we are developing ICT tester with Functional test of PCBA Product. 2 Process Automation / Improvement: • We are developing fixture/ATE for improve process and increase productivity with quality. 3 Develop the Complete Software Solution. • We are work on Varies Software C, LabVIEW, Lab Windows CVI, Test Stand, MATLAB, SQL, Database etc. • IOT (Internet of Thing) Based Solutions. • Cloud Solution. • Embedded Solutions. • Python Based Solutions. • Vision Based Solutions. • BMS 4 PCB Assembly (EMS) • We are making various type PCBA and Box Type Product. 5 Design & Development of Customized Product • Design and development of various models of Integrated Power Management System (IPMS), Static Voltage Stabilizer Based on Leading Edge Power Electronics technology as per the market requirements. • We are Develop the Customized Product as per Customer Requirements
 2023-09-20T10:27:26

Related Posts

update image

🫡 Grateful for the freedom we enjoy, mindful of the responsibility it brings. Happy 15th August!...

2025-08-14T16:17:07 , update date

 2025-08-14T16:17:07
update image

Chemical Earthing Solutions in Gurugram for Reliable and Long-Lasting Safety

2025-08-14T11:46:06 , update date

 2025-08-14T11:46:06
update image

Digital Grounding Device

2025-08-11T11:48:43 , update date

 2025-08-11T11:48:43
update image

Save Yourself from Electrical shock

2025-08-11T11:45:15 , update date

 2025-08-11T11:45:15