Airports Authority of India
ATS Complex, Chennai Airport, Chennai -600027.
No: AAI/CNS/TXSTN/Earthing/15-16 Date: 22-09-2015
Notice Inviting Quotation
Name of work: Supply of Earthing materials and installation of Three Earthing pits at
Transmitter station, Mugalivakkam, Mount Poonamalle road, Chennai-116.
Sealed Quotations are invited for the above mentioned work from Firms / Agencies who have
carried out the similar type of work of supply of Earthing materials and installation of Earthing
pits. Your offer should reach the office of the Assistant General Manager (Com. Stores), Airports
Authority of India, Opposite to Old Airport, Meenambakkam, Chennai – 600 027 on or before
13th October, 2015 at 1500 Hrs and it will be opened on the same day at 1530 hrs. In
this regard, please refer to the schedule of quantity and terms & amp; conditions given below.
SCHEDULE OF QUANTITY:
S.No. Description Qty Unit Rate Amount
SH-1 Supply of Materials
01 Copper plate 1 ft. x 1 ft. x 2mm
Qty:15 Nos.
27.9 Kg
02 Copper strip 25mm x 2mm, 10 Mtrs (No Joint)
Qty: 3 Nos.
21.6 Kg
03 Charcoal powder 270 Kg
04 Salt 135 Kg
05 GI pipe 40mm , With Nut-Bolt 12 Mtrs
06 PVC pipe 40mm dia and 3 m with holes of 12mm dia
within 15 cm from bottom to 2m height
3 Nos
07 C1 Cover Main Hole Test Point 3 Nos
08 Reducer 3 Nos
09 Funnel 3 Nos
10 SAND (RIVER) 210 CFT
Total
Tax as applicable
Total of SH-1
SH-2 Labour for installation of earth pit as per LOW attached
01 Preparation of earth pit of Dimension
4.5ft. x 4.5ft. x 10ft. including brazing and
installation of Material as required in-complete as
shown in the diagram.
3 Nos.
Service Tax
Total of SH-2
Grand total (SH-I+SH-II)
Page 2 of 8
TERMS & amp; CONDITIONS:
1. The quotation must be valid for a minimum of 60 days from the date of opening of the
quotation.
2. The quotations received after due date and time will not be entertained.
3. The scope of work involves supply of Earthing material and installation of three Earthing
pits as shown in the schedule of quantity.
4. The quotations that are incomplete (not attached with Schedule of Quantity, in Original
format) and not meeting technical specifications are liable to be rejected outright.
5. The firm shall carry out the work as per the schedule of quantity.
6. Quality: Purity of Copper Material should not be less than ninety percent.
7. 100% payment shall be made after successful completion of work and satisfactory
demonstration/measurement of the earth resistance and submission of bill.
8. Airports Authority of India reserves the right to reject any or all quotations without
assigning any reason.
9. The taxes and levies shall be quoted separately.
10. Time allowed to complete the work is 30 days.
11.In the event of delay as per the delivery schedule or as ordered, for a delay in delivering
the item ordered, liquidated damages @1% of the value of the work order per week of
delay, treating part of week as one whole week subject to maximum of 10% of the
value ordered will be deducted in making payment.
12. TDS will be deducted wherever applicable.
13. The Name of the Work shall be Super Scribed on top of the Envelope of your offer.
Page 3 of 8
TECHNICAL SPECIFICATIONS FOR INSTALLATION OF 5 PLATE
EARTH PITS (3 Nos) FOR NEW ZENITEL ANTENNA
DETAILS OF SPECIFICATION OF EARTHING MATERIALS AND
INSTALLATION OF ONE EARTH PIT
Sl.
No
DESCRIPTION Qty/
Unit
Qty
For
Three
pits
01 Copper plate 1 ft. x 1 ft. x 2mm
5 nos.
9.3 Kg. 27.9
Kg
02 Copper strip 25mm x 2mm,
10 Mtrs (No Joint)
7.2Kg. 21.6Kg
03 Charcoal powder 90 Kg. 270 Kg
04 Salt 45 Kg. 135 Kg
05 GI pipe 40mm , With Nut-Bolt 4 Mtrs 12 Mtrs
06 PVC pipe 40mm dia and 3 m with
holes of 12mm dia within 15 cm
from bottom to 2m height
1No 3 Nos
07 C1 Cover Main Hole Test Point 1 No. 3 Nos
08 Reducer 1 No. 3 Nos
09 Funnel 1 No. 3 Nos
10 SAND (RIVER) 70CFT 210 CFT
11 Preparation of earth pit
Dimension 4.5ft. x 4.5ft. x 10ft.
including brazing and installation of
Material as required in-complete as
shown in the diagram.
On
work
On work
Page 4 of 8
LIST OF WORKS – EARTHING SYSTEM
1. Site:
1.1 The Earthing system shall be installed at sites selected for Antenna for Zenitel Transmitter as
per drawings on page no. 4, 5 and 6.
1.2 The location of earth installation shall be nearest to antenna i.e. on side of building where
minimum conductor length is required to run between antenna and earth position.
2. Installation procedure:
2.1 Soil resistance may be examined before executing the earth pit work. Necessary
supporting document in this regard shall be submitted to the competent authority for
approval of installation of earthing system.
2.2 Earth pit: An earth pit of 4.5feet X 4.5 feet x 10 feet for five plates shall be made and the
depth of this pit shall be up to such an extent that at bottom moisture soil is available.
2.3 Artificial treatment of soil:-
(a) Irrespective of moisturisation (except where water is available within 2 or 3 feet), the
treatment is required.
(b) In rocky places, some amount of loose soil of good quality to be brought and spread
in the pit before commencement of treatment.
(c) Bottom most layer of treatment shall be of River Sand of good quality a100mm
thickness spread over complete pit.
(d) The Next layer of treatment shall be of Sodium Chloride (common salt) of a 50 mm
thickness spread over complete pit.
(d) The next layer shall be of Coke up to 75 mm over common salt layer.
(e) Before putting any other treatment provision should be made for joining of connecting
conductors between equipment and earth plate, the details as specified in Para 4.2.
(f) Above the plate charcoal powder, salt and river sand shall be filled as per the diagram
in page no.6.
(g) The remaining pit shall be filled with earth soil of good quality and water treatment
shall be provided at intervals so that the earth materials get set completely and compact.
3. Connection of Earth Plate with Earth Conductors
3.1 Type of Earth conductor: The earth conductor shall be a copper strip connected
directly to earth plate and antenna chassis.
3.2 The connecting conductors shall be bolted (brass bolts) with antenna.
Page 5 of 8
4. Provision of Water Treatment
4.1 A two inches GI pipe shall be laid diagonally from centre earth plate up to 250mm
below the average earth level in such a way that its top position goes out of pit.
4.2 At bottom the pipe should not stuck directly against the plate. Provision shall be made
for water inlet over plate as per drawing.
4.3 At top, there shall be a provision of closing this pipe so that foreign agent does not
enter into it.
4.4 A funnel of appropriate size to be made available to station for future water treatment
to the system.
5. Provision of Hand Hole
At the point of termination of a pipe from earth plate, a hand hole shall be made as per drawing.
The hand hole size as per diagram in page No: 5
5.1 It is to be ensured that the hand hole must remain out of earth pit area.
5.2 The top level of hand hole shall remain above the average earth level by 2 feet.
5.3 The top of hand hole shall be covered by a GI cover in such a manner that it hanged
to GI frame.
6. Earth Resistance
The earth resistance at each electrode shall be measured. No each electrode shall have a
greater ohmic resistance than 1 ohm as measured by an approved earth testing apparatus.
In rocky soil the resistance may be up to 3 ohms.
Where the above stated earth resistance is not achieved, necessary improvement shall be made
by additional provisions, such as additional electrode(s), different type of electrode, or artificial
chemical treatment of soil etc., as may be directed by the competent authority, at additional cost
as per the provisions of the contract.
Page 6 of 8
25mm X 2mm x 10mts COPPER STRIPS
*COPPER BRAZING IN 10 POSITIONS (TOTAL)
1 feet x 1 feet x 2mm 1 feet x 1 feet x 2mm
Copper plates Copper plates
* 45®
*4”
*4”
*4”
* 6”
*4”
*
Page 7 of 8
UPPER PORTION OF THE EARTH PIT TO BE CONSTRUCTED
with CI cover hinged to CI FRAME
1 foot 9 inches
5 inches Brick work with
plastering (inner and outer)
2 feet
2 feet 7 inches
The funnel for water treatment must be inside the enclosure
Page 8 of 8
6x25x150mm copper bus bar
FUNNEL WITH MESH
WATER PIPE
G.I PIPE
FILL REST OF THE PIT WITH
CLEAN SOIL
COPPER STRIP
RIVER SAND 200 mm
SALT 50 mm
COKE 75 mm
RIVER SAND 100 mm
50 mm SALT
75 mm COKE
5 COPPER PLATES
75mm COKE
50mm SALT
100mm RIVER SAND